Plate Bearing Tests Are Used for Designing & Safety Testing Wind Farms.
The plate bearing tests are used to confirm that the lift off plans and wind farm design can be safely installed on the planned development site. Plate bearing tests may be required for several locations throughout wind farm including:
-
Wind Farm Access Road
-
Temporary Structures and Working Platforms
-
Piling mats
-
Crane bases
-
Testing of bases & shallow foundations for temporary buildings and structures
-
Site of the Wind Turbines
Plate bearing test (also known as “plate load”) is one of the in situ investigations used during the planning and construction of wind farms. The results of the Plate Bearing Test are used to confirm that roads and hardstand designs meet the minimum requirements for compaction and bearing capacity. The results are also used to confirm that the Wind Turbine installation designs are appropriate for that site.
More Information on Site Investigation Services.
What Is the Site Investigation Process?
Site investigations are carried out with a phased approach
- Phase 1 Desk Study
- Phase 2 Intrusive Site Investigation
- Phase 3 Post Site Investigations
- Phase 4 Site Investigations Report
Step 1 – Complete the Phase I Desk Study and site walkover.
A Phase 1 Desk Study is a preliminary risk assessment report for a development site, often required for planning application approval.
Ideally, a Desk Study should also be accompanied by a walk over a survey conducted by an experienced practitioner. By compiling available information in relation to a site’s environmental, geological, hydrogeological, hydrological and mining setting, a cost-effective and focussed site investigation will be developed.
A Phase 1 Desk Study should always precede any ground investigation.Using the interpretive report to highlight potential development issues, environmental and cost liabilities requiring further investigation.
Step 2 – Phase 2 Intrusive Site Investigation
A Phase 2 assessment consists of an Intrusive Site investigation with quantitative risk assessment. The Phase 1 Desk Study will highlight the areas for further investigation and define the scope of these works. Any potential pollutant linkages can then be prioritised for investigation and depending on the Phase 1 Desk study report the appropriate investigation techniques utilised.
Step 3 – Post Site Investigations
Once the preliminary site investigations have been completed the results are analysed. If further site investigations are required these can be completed by our multi-disciplined team. These could include:
- Environmental Monitoring
- Soil Testing
- Geotechnical Monitoring
- Slope Stability Assessment
- Radon Monitoring
- Remediation Designs
- Gas protection measures.
Step 4 – Site Investigation Report
An interpretive report will then be compiled from all the information and data gathered from the ground investigations, testing, monitoring for the site.
Our Earth Environmental & Geotechnical consultants can discuss the details of the report and provide further services as required